The pricing model you choose decides who carries the risk on a software project. Pick the one that fits how well your scope is understood.
When you hire a development team, the price is only half of the commercial question. The other half is how you pay: a fixed amount for a defined scope, or an hourly or daily rate for the time spent. That choice determines who bears the risk if the project takes longer, costs more or turns out to need something different.
Both models are legitimate, and both fail in the wrong situation. This article compares them, covers a third option, fixed capacity, that suits ongoing product work, and describes a hybrid approach that avoids the worst failure modes of each.
In a fixed-price engagement, the agency agrees to deliver a defined scope for a set fee. The scope is written down in a statement of work, usually with deliverables and acceptance criteria. The price doesn’t change unless the scope does, and the fee is normally quoted excluding VAT, which is added to each invoice.
In time and materials (T&M), you pay for the hours or days the team works, at the rates agreed in the contract. The agency typically gives an estimate or a budget range, and you’re billed against the time worked, with VAT added to each invoice.
Fixed capacity sits between the two. You pay a fixed monthly fee for a set amount of team time, for example a set number of developer days each month, and you decide what that time is spent on. The fee doesn’t change from month to month, but the scope does.
It is sometimes sold as a dedicated team or a monthly retainer. The names vary, so read the contract for three things: how much time the fee buys, what happens to unused time, and how much notice either side needs to change or end it.
The difference is what is fixed. Fixed price fixes the scope and the fee, and the agency carries the risk of the work taking longer. Fixed capacity fixes the time and the fee, and you carry the risk of the backlog taking longer than you hoped. You get budget certainty from both, but only fixed price promises a defined result for the money.
It fits badly when you need a defined deliverable by a date. A fixed monthly amount of time doesn’t promise that anything specific will be finished, so a first build is usually better priced as fixed price or a hybrid.
| Factor | Fixed price | Time and materials |
|---|---|---|
| Budget certainty | High, if scope holds | Low to medium, unless capped |
| Flexibility | Low, changes need approval | High |
| Who carries delivery risk | Mostly the agency | Mostly you |
| Upfront effort | High, detailed scope needed | Low |
| Speed to start | Slower | Faster |
| Best for | Well-defined projects | Evolving or exploratory work |
| Typical failure mode | Disputes over what was in scope | Spend drifts without clear outcomes |
| Your role | Review and accept deliverables | Prioritise and steer continuously |
The deciding factor is how well you understand what you’re building.
Choose fixed price when:
Choose time and materials when:
Be careful with:
Most B2B software projects sit between the two extremes. You know the problem and roughly the shape of the solution, but not the details. A hybrid model fits that situation well.
The structure is simple:
This gives you most of the benefits of both models. Discovery removes the biggest unknowns before you commit to the full budget. Milestones keep spend predictable and give you natural exit points. Changes stay possible without a full renegotiation.
A fixed-price discovery phase is also a cheap way to find out whether an agency communicates well and thinks clearly, before you commit to a larger project.
Whatever model you choose, a few questions show how an agency works. Pay attention to how specific the answers are.
A good agency will give direct answers and will tell you about risks you hadn’t considered. A vague or overly smooth answer to the last group of questions is a reason to keep looking.
Here’s how this plays out for common B2B projects.
Fixed price gives you certainty when the scope is clear. Time and materials gives you flexibility when it isn’t. Fixed capacity gives you a predictable monthly spend for ongoing work. Each fails when applied to the wrong kind of project.
For many B2B teams, the best answer is a hybrid: a fixed-price discovery phase to define the work, then milestone pricing to deliver it. Whichever model you pick, ask direct questions about scope, change and code ownership, and ask to see working software regularly.
If you’re deciding how to structure an upcoming project, get in touch. We’ll recommend the model that fits, even if it isn’t the easiest one for us.
Keep reading
The cost of custom software depends on scope, integrations and risk. Here's what moves the number, what you pay after launch and how to keep spending under control.
In the UK, the agency owns the copyright in the code it writes unless the contract hands it to you. Here's what to check before you sign.
Off-the-shelf software is the right answer more often than agencies like to admit. Here's how to tell when it isn't.
Tell us what you need and we'll reply within one working day. Once it's sent, you can book a free 30-minute call with Louie, our founder, and we'll follow up with a written quote.